Arrangement of the Gruber canal
Year of completion: 2015
Investor: Municipality of Ljubljana
Location: Ljubljana
Within the framework of the Ljubljana for Green Mobility project, the implementation included the arrangement of the banks of the Gruber canal with the port, the arrangement of part of Gruberjevo nabrežje Street and the service facility 2. The docks are made in the form of pontoons, floating on the water and contain 12 berths for river ships, the surface is paved, and the banks are arranged cascading.