Arrangement of the Gruber canal

Year of completion: 2015
Investor: Municipality of Ljubljana
Location: Ljubljana

Within the framework of the Ljubljana for Green Mobility project, the implementation included the arrangement of the banks of the Gruber canal with the port, the arrangement of part of Gruberjevo nabrežje Street and the service facility 2. The docks are made in the form of pontoons, floating on the water and contain 12 berths for river ships, the surface is paved, and the banks are arranged cascading.

Related projects

Construction of the Latterman underpass as part of the Ilirija swimming pool project

Latterman underpass

Ljubljana
Footbridge Maribor

Footbridge Maribor

Maribor | 2023
P+R Sonce car park

Sonce car park

Koper | 2022