Composting plant MBO Simbio

Year of completion: 2015
Investor: SIMBIO d.o.o.
Location: Celje

Implementation of construction and craft works for upgrades of MBO (mechanical biological treatment of waste) and composting plants in the area of the Regional Waste Management Center Celje. Structure of the prefabricated building made of galvanized steel construction on the base AC wall, arched roof covered with a dedicated canvas. The facility consists of technological assemblies: PMKO part, BIO part, covered fans with piles ventilation system, bio filter with humidifier, pool of technological lines with piles humidification system and administrative part for control. The facility with floor ventilation for raw materials and ceiling extraction of air via a water filter has a constant underpressure. Floor distribution connected to the outdoor collecting pool. Rainwater is recycled.

Related projects

Footbridge Maribor

Footbridge Maribor

Maribor | 2023
Bridge over Mali Graben

Bridge over Mali Graben

Ljubljana | 2016
Construction of the Latterman underpass as part of the Ilirija swimming pool project

Latterman underpass

Ljubljana